
Home › Deck repairs and re-decking
Deck Repairs and Re-Decking in Christchurch
Soft boards, a bouncy frame or a balustrade that moves when you lean on it. Find out whether the deck can be repaired or needs replacing before it costs more.
- Honest call on repair versus rebuild
- Boards, joists, piles, steps and balustrades
- Old decks re-boarded in pine, hardwood or composite
Get a free quote
Tell us about the job. We reply within one working day.
Many Christchurch decks date from the 1980s and 1990s, and a lot more were built or patched in a hurry after the earthquakes. Pine boards from that era are at the end of their life, and frames built close to the ground have often been sitting damp for decades.
Not every tired deck needs to come out. If the piles and frame are sound, new boards on the old frame gives you what looks like a new deck for a good deal less. If the frame has gone, it is cheaper to say so at the start than to find out with half the boards off.

Signs a deck needs attention
- Boards that feel soft or spongy underfoot, or a screwdriver that sinks into the timber.
- Nails lifting, boards cupping, or wide splits along the grain.
- A balustrade or handrail that moves when pushed.
- A deck that has pulled away from the house, or dropped at one corner.
- Bounce when you walk across the middle.
- Black staining and rot where joists meet the bearer or the house.
A loose balustrade on a raised deck is a safety problem, not a cosmetic one. Have it looked at before the next time you have people over.
Repair, re-board or rebuild
Repair
A few boards, a step, a post or a section of handrail replaced. Sensible when the rest of the deck has years left in it.
Re-board
All the boards come off and the frame is checked joist by joist. Damaged joists are replaced or doubled up, then new boards go on. This is where an old pine deck can become a hardwood or composite one, provided the joist spacing suits the new board.
Rebuild
When the piles have rotted at ground level, the bearers have gone soft, or the frame was never built properly, a new deck is the only fix that lasts. The old one is removed and taken away as part of the job.
After the earthquakes
Decks on properties that settled or tilted in 2010 and 2011 are often out of level, and some were re-fixed to houses that were later re-levelled. If your deck slopes the wrong way, holds water against the house, or has gaps at the ledger, mention it at the site visit.
Cleaning and re-oiling
A structurally sound deck that has gone grey and rough can usually be brought back with a proper clean, a light sand where needed and fresh oil or stain. The deck staining guide covers how to do it yourself and when it is worth paying someone.
What deck repairs cost
| Item | Guide price |
|---|---|
| Removing an old deck | $500 to $1,500 |
| New pine deck, for comparison | $600 to $1,000 per m² |
| New hardwood deck, for comparison | $900 to $1,400 per m² |
| Balustrade replaced | $250 to $450 per lineal metre |
Repairs are priced after someone has looked under the deck. Re-boarding a sound frame costs noticeably less per square metre than a new deck because the piles and framing stay.
Questions about deck repairs and re-decking
Is it worth repairing an old deck?
If the piles and frame are sound, yes. New boards on a good frame cost much less than a new deck. If more than about a third of the frame needs replacing, a rebuild is usually better value.
Can you put new boards on my existing frame?
Yes, when the joists and bearers are sound and spaced to suit the new board. The frame is checked once the old boards are off, and any damaged joists are replaced at that point.
How do I know if my deck is safe?
Push firmly on the balustrade, walk the whole deck feeling for soft or bouncy spots, and look underneath for rot where timbers meet. If anything moves that should not, keep people off the raised part until it has been checked.
Do repairs need a building consent?
Like-for-like repairs with comparable materials generally do not. Rebuilding a raised deck, or changing its size or height, may. Your builder will tell you at the site visit.
From first call to finished job.
Tell us about the job
Send the form or call. A rough size and a suburb is enough to start.
Free site visit
The builder measures up, looks at the ground and access, and talks through boards and layout.
Written, itemised quote
Materials, labour and extras listed separately, with a start date. No obligation.
Build and walk-through
One crew from piles to final board. You check the finished deck before the last invoice.
Get a price on deck repairs and re-decking
Send the form and we will arrange a free site visit and a written, itemised quote. Or ring and talk it through.
Request a free quote
Tell us about the job. We reply within one working day.